,

BR, Thompson Class A2/2, 4-6-2, 60505 ‘Thane of Fife’ – Era 5

60505 Thane of Fife spent eighty-five days in Doncaster Works being rebuilt as a Class A2/2, the heavy overhaul taking place between 26 October 1942 and 18 January 1943 and the Diagram 118 boiler was fitted during a general overhaul at Doncaster between 29 January and 7 March 1952.

60505 Thane of Fife was allocated to Peterborough’s New England shed at this time, home to the ‘Lodge Link’ crews and as a result, Thane of Fife tended to work longer distance freight and passenger diagrams to Newcastle, as well as working turns to York and Kings Cross.

Categories: ,

BR, Thompson Class A2/2, 4-6-2, 60505 ‘Thane of Fife’ – Era 5

60505 Thane of Fife spent eighty-five days in Doncaster Works being rebuilt as a Class A2/2, the heavy overhaul taking place between 26 October 1942 and 18 January 1943 and the Diagram 118 boiler was fitted during a general overhaul at Doncaster between 29 January and 7 March 1952.

60505 Thane of Fife was allocated to Peterborough’s New England shed at this time, home to the ‘Lodge Link’ crews and as a result, Thane of Fife tended to work longer distance freight and passenger diagrams to Newcastle, as well as working turns to York and Kings Cross.

Reviews

There are no reviews yet.

Be the first to review “BR, Thompson Class A2/2, 4-6-2, 60505 ‘Thane of Fife’ – Era 5”

Your email address will not be published. Required fields are marked *

Scroll to Top