,

BR, Class 43, DVT, 43013 – Era 8

The electrification of the East Coast Mainline occurring in 1987 was almost complete, with deliveries of new electric Class 91s occurring when British Rail realised the Mk4 coaches and Mk4 DVT were still not ready to go into service.

As a result, eight eastern region HST power cars were converted to operate as surrogate DVTs in tandem with the new electric locomotives and a rake of Mk3 coaches. The conversion process involved the fitting of buffers and remote-control equipment.

Categories: ,

BR, Class 43, DVT, 43013 – Era 8

The electrification of the East Coast Mainline occurring in 1987 was almost complete, with deliveries of new electric Class 91s occurring when British Rail realised the Mk4 coaches and Mk4 DVT were still not ready to go into service.

As a result, eight eastern region HST power cars were converted to operate as surrogate DVTs in tandem with the new electric locomotives and a rake of Mk3 coaches. The conversion process involved the fitting of buffers and remote-control equipment.

Reviews

There are no reviews yet.

Be the first to review “BR, Class 43, DVT, 43013 – Era 8”

Your email address will not be published. Required fields are marked *

Scroll to Top