fbpx
,

GWR, Mk3 Trailer Standard Open, Coach D, 42005 – Era 11

The BR Standard Mk.3 coach was introduced to traffic between 1975 and 1988, on both high speed and locomotive hauled services and quickly became a regular sight on Britain’s main line services.

In 2014, First Great Western refurbished its Mk.3 first class carriages with interiors that dropped the First Great Western branding in favour of a new GWR logo and the whole company was subsequently rebranded as Great Western Railway (GWR) on 20 September 2015, with rolling stock featuring a dark green livery that echoed that of the former Great Western Railway.

Each BR Standard Mk.3 coach model measures in at 303mm in length.

Categories: ,

GWR, Mk3 Trailer Standard Open, Coach D, 42005 – Era 11

The BR Standard Mk.3 coach was introduced to traffic between 1975 and 1988, on both high speed and locomotive hauled services and quickly became a regular sight on Britain’s main line services.

In 2014, First Great Western refurbished its Mk.3 first class carriages with interiors that dropped the First Great Western branding in favour of a new GWR logo and the whole company was subsequently rebranded as Great Western Railway (GWR) on 20 September 2015, with rolling stock featuring a dark green livery that echoed that of the former Great Western Railway.

Each BR Standard Mk.3 coach model measures in at 303mm in length.

Reviews

There are no reviews yet.

Be the first to review “GWR, Mk3 Trailer Standard Open, Coach D, 42005 – Era 11”

Your email address will not be published. Required fields are marked *

Scroll to Top
Onze experts nemen de tijd om uw tv en home cinema surround systeem nauwkeurig in te stellen volgens de optimale parameters. The first step in installing a metal roof is to measure the roof and order the materials.